Institutional, Laboratory & Technology Facilities
Sebeta Laboratory Centre — Design and Bill of Quantities
-
Show image 1: Main entrance gate and guard house designed by HOPE for the Bio and Emerging Technology Institute (rendering)
-
Show image 2: BETin entrance: the guard house with the institute's sign behind a reflecting pool (rendering)
-
Show image 3: BETin entrance canopy with linear lighting over the vehicle lane (rendering)
-
Show image 4: BETin entrance wall with the institute's name in stainless-steel letters (rendering)
-
Show image 5: Close view of the BETin name wall in travertine and stainless steel (rendering)
The project
Project
Project
overview.
Design and bill of quantities for the renovation of the Bio and Emerging Technology Institute's laboratory centre in Sebeta, awarded to HOPE through the national e-GP system in 2026.
Scope
- Design
- Bill of quantities
Client references
Letters and certificates about this project.
-
Appreciation letter · Award / acceptance letter · +2
Bio and Emerging Technology Institute — award and certificate of appreciation
2 projects
BETin awarded HOPE, through the national e-GP system, the design and bill of quantities for its laboratory centre in Sebeta (2026). A BETin certificate of appreciation recognises HOPE's contribution as consultant for the Chancho milk production and medicinal plant research sub-centre.
Next conversation
Request a proposal