Geotechnical Investigation, South Ethiopia Regional State Buildings
-
Show image 1: HOPE field team at a borehole for the South Ethiopia Regional State buildings
-
Show image 2: Drilling rig on its tripod at a building site
-
Show image 3: Borehole drilling, with core boxes ready for the samples
-
Show image 4: Drilling rig at work on an open site
-
Show image 5: Drilling crew at the rig
-
Show image 6: Engineers taking soil samples in a test pit
-
Show image 7: Red clay samples from the borehole in core boxes
-
Show image 8: Core box with the soil samples of one borehole, labelled by depth
Project
overview.
Foundation investigations for the South Ethiopia Regional State office and residential buildings in Wolaita Sodo and Arba Minch, as sub-contractor to the Ethiopian Construction Works Corporation: drilling, laboratory testing and technical reports, completed ahead of schedule and accepted by ECWC's central laboratory.
Scope
- Drilling and sampling
- Laboratory testing
- Geotechnical reports and foundation recommendations
Client references
Letters and certificates about this project.
-
Testimony / reference letter · Performance letter · +5
ECWC — testimony letter, South Ethiopia Regional State buildings investigation
The Ethiopian Construction Works Corporation certifies that HOPE, as its sub-contractor, completed the foundation investigations — drilling, laboratory testing and technical reports — for the South Ethiopia Regional State office and residential buildings in Wolaita Sodo and Arba Minch ahead of schedule. ECWC's laboratory accepted the final report and the final payment was approved.
-
Testimony / reference letter · Performance letter · +2
ECWC — testimony letter, Ministry of Defence buildings investigation
3 projects
The Ethiopian Construction Works Corporation certifies that HOPE, as its sub-contractor, completed the foundation investigation for the four-block B+G+2 Sector Four buildings ahead of schedule, and that it is highly satisfied with the quality and timeliness of the work. ECWC's performance evaluations of HOPE are included.
Site investigation photo
Geotechnical Investigation, EAG Resettlement Project Lot 1, Bishoftu
1 approved reference
Site investigation photo
Geotechnical Investigation, Ministry of Defence Sector Four Buildings
1 approved reference
Site investigation photo